The project and its requirements
Rehabilitation of the bridge in Astoria aimed to reduce future maintenance costs and limit concrete damage caused by reinforcement corrosion.
How the reinforcement was used
MateenBar™ was used to reinforce the deck to extend the service life of the repaired structure.


